An Aurion+ heavy lift vessel alongside an offshore platform at sunset, its crane lowering a process module into place with support tugs standing by

Unlocking your offshore potential

Your trusted partner for comprehensive offshore oil and gas engineering solutions.

Up to 2.2 million barrels
Floating Storage Unit capacity
Up to 230 kV
Submarine power transmission

Our capabilities

Aurion+ and our strategic partners integrate industry-leading expertise with advanced technology to deliver full-scope offshore engineering and technical services.

From initial design to ongoing maintenance, our uncompromising commitment to safety, operational efficiency and cost-effectiveness ensures we provide superior turnkey solutions tailored to your project's unique requirements.

Delivered through our British Virgin Islands office

Why choose Aurion+?

We are driven by a foundational set of core strengths that position us as a leader in offshore engineering.

Aurion+ offshore team reviewing an inspection on a platform deck
  • Full Value Chain Coverage

    Comprehensive support from project inception to completion.

  • Proven Technology & Experience

    Leveraging reliable, cutting-edge methodologies and seasoned industry knowledge.

  • Global Resource Network

    Unrestricted access to world-class talent, partnerships and logistical support.

  • Strong QHSE Focus

    Dedicated adherence to the highest standards of Quality, Health, Safety and the Environment.

  • Innovation & Cost Optimisation

    Delivering intelligent solutions that maximise asset value and operational efficiency.

Core services

  1. 01

    Full-Scope EPCIC Services

    Expert management and execution of Engineering, Procurement, Construction, Installation and Commissioning for all offshore developments.

  2. 02

    Transportation & Installation

    Specialised logistics teams equipped to safely and precisely handle the transportation and installation of large-scale offshore structures.

  3. 03

    Inspection, Repair & Maintenance (IRM)

    Comprehensive lifecycle services designed to guarantee the long-term integrity, safety and performance of your critical assets.

  4. 04

    Vessel Modifications & Repairs

    Tailored engineering assessments and vessel conversion services to maintain peak fleet efficiency and operational readiness.

  5. 05

    End-to-End Engineering Solutions

    Robust technical support spanning all disciplines, from preliminary feasibility studies to final detailed design.

  6. 06

    Project Management Consulting

    Professional oversight and strategic guidance to ensure your projects are delivered on schedule, within budget and fully aligned with global safety standards.

Engineering heritage meets environmental stewardship

Aurion+ leverages decades of heavy offshore EPCIC, subsea engineering and marine operations experience to tackle one of the offshore energy and maritime sectors' most urgent challenges: extending asset integrity while driving down industrial pollution.

Rather than deploying capital-intensive, carbon-heavy new fabrication, today's operational landscape demands intelligent asset life-extension.

By applying precision engineering, advanced non-destructive inspection and targeted intervention to operational platforms, subsea pipelines, floating storage units and marine spreads, Aurion+ directly mitigates fugitive emissions, eliminates hydrocarbon leaks and curtails embodied carbon across marine energy infrastructure.

Proven engineering foundation

Our operational methodologies are grounded in the successful delivery of complex offshore EPCIC developments, deepwater marine operations and critical asset interventions across demanding offshore environments.

  • Subsea Infrastructure & Pipeline Integration

    Turnkey delivery of complex infield pipelines, flexible riser replacements, deepwater umbilical installations, and high-voltage submarine power transmission lines (up to 230 kV) connecting offshore systems to shore grids.

  • Topside & Platform EPCIC

    Engineering, procurement, fabrication and commissioning of wellhead platforms, living quarter topsides, complex bridge networks and gas utility modules.

  • Offshore Terminals & Large-Scale Storage

    Turnkey installation, mooring hookup, commissioning and operations management for major Floating Storage Units (up to 2.2 million barrels capacity) and Single Point Mooring (SPM) terminal systems.

  • Marine Vessel & Barge Conversions

    Reconstruction, dry-dock overhauls, structural steel renewal, and dynamic positioning upgrades (DP I to DP II) on heavy crane barges, jack-up rigs and specialised cable-laying vessels.

  • Decommissioning & Environmental Hazard Remediation

    High-risk marine salvage, topside and jacket removal, and hazardous fluid recovery, including complete diesel and lube oil extraction from sunken vessels prior to disposal.

  • Aerial view of an offshore oil and gas field at dusk: a jack up drilling rig with a lit flare, supply and construction vessels alongside, and a floating production vessel moored beyond

Sustainable asset management: repair, maintain, decarbonise

1.8 to 2.2 tonnes of CO₂
Embodied per tonne of new platform steel
Every tonne of newly fabricated platform steel carries an embodied footprint of approximately 1.8 to 2.2 tonnes of CO₂.

Replacing ageing offshore assets outright is often neither economically rational nor environmentally defensible.

Aurion+ prioritises targeted repair, maintenance and modernisation (IRM) to preserve operational continuity while eliminating primary sources of marine and atmospheric pollution.

Four interventions

  1. 01

    Subsea Mechanical Repair (SMR) & Leak Prevention

    Corrosion, fatigue and subsea connection failures present severe contamination risks to marine ecosystems.

    Aurion+ deploys advanced 3D dimension site surveys, precision underwater machining, diver-assisted clamp installations and structural jacket reinforcement to isolate defects before failure occurs.

    Replacing degraded flexible risers, subsea valves and infield pipelines prevents hydrocarbon release at the source without requiring full infrastructure decommissioning.

  2. 02

    Topside Revamping & Emissions Mitigation

    Ageing process topsides frequently suffer from venting inefficiencies, flaring excesses and equipment degradation.

    Comprehensive revamping programmes overhaul gas processing systems, replace deteriorated valves and piping, and re-engineer metering skids, restoring containment integrity.

    Upgrading compression systems and gas utility facilities eliminates routine venting and captures valuable process gases, driving significant reductions in Scope 1 emissions.

  3. 03

    Surface Protection & Corrosion Containment

    Topside and splash-zone degradation accelerates structural fatigue and causes micro-particulate contamination in marine waters.

    Aurion+ executes specialised abrasive sandblasting, advanced splash-zone composite coatings and high-specification insulation programmes across jacket legs, bridges and production decks.

    These systems seal existing structures against harsh marine exposure, arresting chemical leaching and extending structural service life by decades.

  4. 04

    Marine Environmental Salvage & Pollution Abatement

    When assets reach terminal life or suffer catastrophic marine incidents, unmanaged deterioration threatens sensitive waterways.

    Aurion+ executes controlled hazard abatement: performing thorough pre-underwater surveys, offloading trapped hydrocarbons and chemical residues, and safely recovering heavy wrecks or obsolete jackets for controlled onshore recycling.

Core service spectrum

Focus areas, their core activities and interventions, and the environmental and operational benefit of each
Focus areaCore activities & interventionsEnvironmental & operational benefit
Subsea Integrity & SMR3D dimensional surveys, subsea valve retrofits, clamp installations, replacement of flexible risers, and umbilical repairs.Eliminates seabed hydrocarbon spills; prevents costly pipeline ruptures and emergency shutdowns.
Topside & Gas RevampingOverhaul of gas utilities, replacement of piping/valves, metering repairs, and structural bridge remediation.Curtails fugitive methane and volatile organic compound (VOC) emissions; reduces process flaring.
Marine Asset Life ExtensionCrane barge and jack-up overhauls, DP system modernisations, hull plate renewal, and marine anti-fouling recoating.Avoids raw steel consumption for newbuild vessels; upgrades fleet operational efficiency.
Remediation & Hazard RecoveryDe-fuelling sunken wrecks, oil spill containment/recovery services, and safe facility removal.Protects commercial waterways and marine biodiversity from hazardous petroleum discharges.

Closing

Delivering the industrial transition

Decarbonisation does not require abandoning established industrial capital; it requires operating it with elevated standards of efficiency, precision and environmental care.

By applying tier-one offshore engineering discipline to asset preservation, Aurion+ bridges the gap between incumbent marine infrastructure and modern environmental performance.

Selected past projects

Delivered by Aurion+

Featured case study

Rapid Deployment Oil Recovery System

Contract

Client · Oceanus Co. Ltd (South Korea)

Oceanus Co. Ltd awarded Aurion+ a contract to design, procure and supply a highly transportable, high-pressure flexible oil recovery system.

The core requirement was a multi-use system that could be easily mobilised by air to any global location.

Solution

Following a feasibility study, Aurion+ selected a 4-pipe bundle system using 9" fully composite pipe from Deepflex.

Deepflex was chosen for:

  • Innovative, lightweight and strong composite design
  • Dedicated professional engineering support
  • Fast six-month manufacture-to-delivery timeframe
  • Adaptable management suited to changing project needs

Global engineering collaboration

The success of the system relied on specialised components from a network of global partners.

Aurion+ acted as the Main Contractor managing the project.

  • Deepflex

    Supplied the flexible pipe, manufactured at their Manitowoc plant starting in late 2011.

  • Deep-down Incorporated

    Supplied transportation carousels specifically designed to fit inside an Antonov 124 cargo plane.

  • Cuming Flotec

    Manufactured 14 buoyancy modules in Boston that provided buoyancy and clamped the quad pipe bundle together.

  • KPC

    This Oceanus sister company in Ulsan, South Korea, produced the 3-tonne flange connections, which were flown to Chicago and trucked to Manitowoc for final assembly.

The heavy-lift operation

  1. 01

    Logistics

    After final Factory Acceptance Testing was complete, a 10-day window remained to spool and transport the equipment to Michigan's Sawyer International Airport. Four 23.5-tonne carousels were barged downriver from the Deepflex quayside, then trucked to the 3000m runway of the former US Air Force base.

  2. 02

    Loading

    On July 13th, a Polet Airways Antonov 124, one of the world's largest cargo planes with a 120-tonne capacity, “kneeled” to receive the 94-tonne combined cargo.

  3. 03

    Precision

    Because the 13" outer diameter pipe left only centimetres of clearance inside the hold, engineers used 3D modelling to ensure a perfect fit.

  4. 04

    Winching

    A specialised rail system and 30-metre ramp were assembled, allowing the carousels to be smoothly winched into the cavernous hold.

A · Platforms, pipelines and cables

Hengam EPCIC ProjectArabian GulfClientIOOC

Item

3 wellhead platforms (WHP1, WHP2, WHP3), topside EPCIC and subsea pipe and cable laying

Scope of work

  • Basic and detailed engineering, procurement and fabrication, installation, pre-commissioning and commissioning
  • Infield pipelines (14" × 4.2 km)
  • Two rounds of submarine composite cable (power, control, fibre optic) from offshore to onshore facilities (70 km)
FY-A LQ Platform ProjectArabian GulfClientIOEC

Item

Living quarter topside

Scope of work

  • Engineering
  • Procurement
  • Fabrication
  • Onshore commissioning
  • Load-out and transportation
Flexible Riser Pipe Supply & Installation ProjectArabian Gulf
  • Complete design of the replacement riser system
  • Procurement
  • Installation
  • Final testing and commissioning
Subsea Power Cable Laying ProjectVenezuelaClientLS Cable

Item

230 kV submarine cable interconnection

Scope of work

  • Submarine cable shipment
  • Submarine cable laying (32 km × 2 lines, onshore to onshore)
  • Cable landing
  • CPPP (Crossing Point Post Protection)
  • NSB (Near Shore Burial)

B · Floating Storage Unit (2.2 million barrels)

FSU Installation ProjectArabian Gulf

Item

FSU (Floating Storage Unit / 2.2 million barrels)

Scope of work

  • Installation engineering for the FSU
  • Preparation of installation procedure, drawings and documents
  • Positioning of the FSU and hook-up of 8 mooring chains (only 20 days)
  • As-built survey of mooring lines
  • Mobilisation and demobilisation of required marine spread
FSU Commissioning & Start-upArabian Gulf

Item

FSU (Floating Storage Unit / 2.2 million barrels)

Scope of work

  • Remaining punch clearance (187 items)
  • Metering system repair and commissioning
  • FSU offshore commissioning and start-up
FSU Operation and MaintenanceArabian GulfClientSamsung C&T

Item

FSU (Floating Storage Unit / 2.2 million barrels)

Scope of work

  • Operation team management (onshore / offshore)
  • Supply of Project Support Vessel (PSV)
  • Oil spill recovery service
  • Provision of required diver team

C · Repair, maintenance and revamping

C9-C15 Platform SMRArabian GulfClientIOOC

Item

C9-C15 platform jacket

Scope of work

  • Site survey (3D dimension check)
  • Engineering services for SMR operation
  • Supply of equipment and materials for SMR
  • Fabrication and installation for SMR operation
  • Provision of as-built documents and engineering dossiers
Foroozan SMRArabian Gulf

Item

FX, FY, FZ, F15, F16 platform jackets

Scope of work

  • Document review
  • Site survey (3D dimension check)
  • Engineering services for SMR operation
  • Supply of equipment and materials for SMR
  • Fabrication and installation for SMR operation
  • Provision of as-built documents and engineering dossiers
Salman IRMArabian Gulf

Item

9 platforms (Q/1, Q/2, PP/1, PP/2, DP/P, F/P, NP/P, NG/P, SK1) and 12 bridges (B1–B12), topside repair

Scope of work

  • Document review
  • Site survey (3D dimension check)
  • Engineering services for complex repair
  • Supply of equipment and materials
  • Mechanical repair and replacement
  • Sandblasting
  • Painting and splash zone coating
  • Insulation
  • Inspection, testing and reporting
  • Provision of as-built documents and engineering dossiers
Salman Gas Revamping ProjectArabian Gulf

Item

Topsides' equipment and facilities of gas utilities across seven platforms and facilities, including gas processing, accommodation, gas wellhead, oil gathering and gas lift platforms

Scope of work

  • Engineering endorsement
  • Procurement
  • Installation and pre-commissioning
  • Commissioning and start-up of gas processing

Total: over 700 pieces of equipment from 120 vendors

D · Vessels

HL-5,000 Crane Barge Repair and Modification

Item

HL-5,000 crane barge repair, reconstruction and modification

Scope of work

  • Engineering
  • Procurement and fabrication
  • Assembly and installation
  • Load testing and commissioning
  • Training and supervision
CS Creator Modification and Upgrade
  • DP I system (transportation vessel)
  • DP II system (cable laying vessel)

E · Terminals, decommissioning and marine services (awarded 2016 and 2017)

LNG Import Terminal ProjectBahrainClientGS E&CContract signed: 8 November 2016

Item

LNG Import Terminal

Scope of work (offshore work)

  • Transportation and installation of:
    • Regasification platform topside
    • 1 × pipeline / 2 × subsea power cable (4.6 km)
  • EPCI for regasification platform jacket
Removal of 5 wrecksClientTidewater Middle EastContract signed: 23 November 2016

Item

5 wrecks removal

Scope of work

  • Mobilisation and demobilisation of manpower, equipment and marine spread
  • Pre-underwater survey
  • Diesel fuel and lube oil recovery
  • Wreck removal
  • Post-underwater survey
  • Transportation of 5 ships / wrecks
TASDID SPM Replacement ProjectClientTASDIDContract signed: 16 March 2017

Item

  • New SPM (1)
  • Mooring chains with anchors (6)
  • Mooring hawsers (1)
  • SPM replacement (existing to new)
Arzanah Decom Offshore/Onshore FacilitiesAbu DhabiClientZADCOLOA dated: 19 April 2017

Item

Purchase and removal of decommissioned offshore/onshore facilities

Scope of work

  • Data and implementation

Talk to us about an offshore scope

For engineering, installation, inspection or decommissioning enquiries, our team will respond directly.